All articles

Installation insights

Small details. A simpler installation.

How interlocking edges and pre-drilled slots help save time and labour.

Desert Sage fluted siding on an upper-floor feature — architectural visualization

A clean exterior starts with a well-planned installation. NeoLine’s tongue-and-groove edges and factory pre-drilled slots are designed to simplify the work on site.

Connect without separate clips

Interlocking boards align with one another and fasten directly to metal furring or wood strips using self-tapping screws. Fewer separate fastening components help make installation simpler.

Reduce measuring and drilling

Factory fastening slots every ¾ inch reduce on-site preparation. This can help shorten installation time and reduce labour and overall project costs.

Allow for natural movement

When correctly fastened, the elongated slots accommodate expansion and contraction as temperatures change. Use the installation guide for the selected profile to confirm fasteners, clearances and fixing details.

Plan the substructure, trims and transitions before starting. Ask the NeoLine team for installation resources or professional project guidance.

Keep reading.