Glenhaven ZeroGap Decking with Sleeper System

Decking case study

Glenhaven

ZeroGap Decking with Sleeper System

Project overview

ZeroGap Decking with Sleeper System

A closer look at ZeroGap Decking coming together at Glenhaven. The 850 sq ft second-floor deck was built directly over the existing vinyl deck using low-profile AL06 aluminum sleepers, and a crew of three finished it in two days.

Project
Glenhaven
Decking
ZeroGap Decking
Support system
Sleeper System
Deck size
850 sq ft
Crew
3 installers
Installation time
2 days

Project photos

Glenhaven, in detail.

3 photos
ZeroGap boards being installed above the sleeper layout.
The aluminum Sleeper System beneath the decking surface.
The installation team working on the Glenhaven deck.

From the job site

Glenhaven on film.

Glenhaven · Installation
Glenhaven · ZeroGap Decking

The project details

The system beneath the surface.

Low-profile AL06 aluminum sleepers form the support beneath the ZeroGap boards, laid straight over the vinyl deck already in place. The twist-and-click clips make fitting the boards quick and straightforward — that is how a three-person crew completed the 850 sq ft deck in two days and significantly reduced the installation cost.

Your next project

Let’s plan your deck.